Getting the takeoff out as a spreadsheet, and what each column holds.
Export, on the Materials panel, writes the takeoff to Excel or CSV - one row per item, for pricing or for handing on.
| Column | What it holds |
|---|---|
| Code | The bid item code. |
| Name | The item's name. |
| Type | Area, Length or Count. |
| Unit | The reporting unit. |
| BaseQty | What was measured, in the geometry's base unit, before conversion. |
| UnitFactor | The conversion from base to the reporting unit. |
| Mult | The item's multiplier. |
| FinalQty | The quantity as reported. |
| BidQty | The plan quantity from the bid schedule. |
| UnitPrice | The unit price. |
| Amount | Quantity times price. |
| Page | The sheet. |
| Layer | The layer. |
| Depth | The recorded depth. |
| Pitch | The drawing's pitch. |
| Color | The item's colour. |
| Notes | Free text. |
Breaking the quantity into BaseQty, UnitFactor, Mult and FinalQty is deliberate: whoever reads the spreadsheet can see where a number came from instead of being handed a total to take on trust.